OCC Weavers is pleased to announce the successful completion and handover of the Almarai Madinah - 2 Depot. This facility represents a significant addition to Almarai’s logistical infrastructure in the region.
The project highlights OCC Weavers’ capacity to deliver large-scale, specialized industrial facilities under a turnkey model. Spanning a total site area of over 35,000 m², with a built-up construction area of 10,000 m², the depot was designed to provide a comprehensive operational hub.
Some Key Features of the Madinah - 2 Depot:
- Advanced Cold Storage: A high-specification temperature-controlled environment designed to maintain the integrity of Almarai’s world-class products.
- Integrated Logistics Base: Optimized for efficient distribution and fleet management to serve the region.
- Modern Accommodation Building: High-quality living quarters built to support the welfare and comfort of the onsite operational team.
Commitment to Excellence
The successful delivery of this project is a testament to OCC Weavers' unwavering commitment to quality and precision in construction. By managing complex requirements, from specialized refrigeration systems to extensive site infrastructure, we have ensured that the Almarai’s Madinah - 2 Depot stands as a model of industrial efficiency.
This achievement further solidifies the long-standing partnership between OCC Weavers and Almarai, as we continue to build the infrastructure that drives the Kingdom’s growth.
